ARBY'S #1218
2626 Sandy Plains Rd, Marietta, GA 30066
Do you manage or own ARBY'S #1218?
Claim this listing for free ($0) to post a dated, verified public response detailing repairs, vendor receipts, or corrective actions taken.
Official Inspection History
1 recorded inspectionPhysical facilities installed, maintained, and clean — Inspector Note: Observed the WIF in the main kitchen with severe ice build-up on the edge of the door. Ice layer was so thick it prevented the door to close properly the door had to be slammed really hard for the latch to close C/A Good Repair. All physical facilities shall be maintained in good repair.
PIC present, demonstrates knowledge, performs duties — Inspector Note: Observed facility does have a key drop policy however there are no temperatures written on the invoice and manager is not monitoring that. Observed no signed allergen awareness training in the facility. Facility needs to update the employee health policy as well C/A PIC needs to monitor the key drop policy as well as training in allergen awareness C/A: An allergen awareness form was left with the shift manager
Food-contact surfaces: cleaned & sanitized — Inspector Note: Observed a black substance mold like build-up on the chute of the ice bin. C/A ) In equipment such as ice bins and beverage dispensing nozzles and enclosed components of equipment such as ice makers, cooking oil storage tanks and distribution lines, beverage and syrup dispensing lines or tubes, coffee bean grinders, and water vending equipment needs to be cleaned frequently to prevent mold build-up
Food-contact surfaces: cleaned & sanitized — Inspector Note: Observed the nozzles to the water/soda dispenser with black/mold like build-up. C/A ) In equipment such as ice bins and beverage dispensing nozzles and enclosed components of equipment such as ice makers, cooking oil storage tanks and distribution lines, beverage and syrup dispensing lines or tubes, coffee bean grinders, and water vending equipment needs to be cleaned frequent enough to prevent mold build-up COS: Nozzles were washed and sanitized after EHS intervened