CulinAero by Proof of The Pudding/Concession Area-C
2330 Convention Center Concourse Atlanta, Fulton, GA 30337
Do you manage or own CulinAero by Proof of The Pudding/Concession Area-C?
Claim this listing for free ($0) to post a dated, verified public response detailing repairs, vendor receipts, or corrective actions taken.
Official Inspection History
3 recorded inspectionsPhysical facilities installed, maintained, and clean โ Inspector Note: Observed multiple ceiling tiles missing in main kitchen. Operator must replace missing tiles. 511-6-1.07(2)(f),(g) - Wall & Ceiling Coverings & Coatings; Wall & Ceiling Attachments (C) (f) Wall and Ceiling Coverings and Coatings. 1. Wall and ceiling covering materials shall be nonabsorbent, light colored, and attached so that they are easily cleanable.
Adequate handwashing facilities supplied & accessible โ Inspector Note: Observed no hand drying provisions provided at hand wash sink in main kitchen. CA: Instructed Operator to replenish paper towels during routine inspection. 511-6-1.07(3)(b) - Hand Drying Provision (Pf) (b) Hand Drying Provision. Each handwashing sink or group of adjacent handwashing sinks shall be provided with: 1. Individual, disposable towels; Pf 2. A continuous towel system that supplies the user with a clean towel; Pf 3. A heated-air hand drying device; Pf or 4. A hand drying device that employs an air-knife system that delivers high velocity, pressurized air at ambient temperatures.Pf