Gekko West End Inc
1020 White St, Fulton, GA 30310
Do you manage or own Gekko West End Inc?
Claim this listing for free ($0) to post a dated, verified public response detailing repairs, vendor receipts, or corrective actions taken.
Official Inspection History
2 recorded inspectionsHot and cold water available; adequate pressure — Inspector Note: I observed failure to provide hot water throughout the premises 511-6-1.06(1)(g),(h) - Water Supply, Capacity; Pressure (Pf) (g) Capacity. 1. The water source and system shall be of sufficient capacity to meet the peak water demands of the food service establishment. Pf 2. Hot water generation and distribution systems shall be sufficient to meet the peak hot water demands throughout the food service establishment. Pf (h) Pressure. Water under pressure shall be provided to all fixtures, equipment, and nonfood equipment that are required to use water except that water supplied as specified under subsection (1)(k)1 and 2 to a temporary food service operation or in response to a temporary interruption of a water supply need not be under pressure. Pf C.A: : PIC told to provide alternative source of hot water or seize operation until the hot water system is fixed