K KaldiScores
Fulton County
Base of Operation Fulton County Permit: fsp-060-013443

JUMBO CATERING AND MOBILE FOOD TRUCK

2792 East Point St, Atlanta, GA 30344

93 A
Most Recent Score
Excellent
Routine • 2026-03-19
Public Records Freshness: Data current as of September 16, 2026.
Verify live on official Fulton Health portal ↗
For Restaurant Operators

Do you manage or own JUMBO CATERING AND MOBILE FOOD TRUCK?

Claim this listing for free ($0) to post a dated, verified public response detailing repairs, vendor receipts, or corrective actions taken.

Official Inspection History

1 recorded inspection
A (93) Routine Most Recent
Inspection Date: 2026-03-19 • Violations Cited: 3
Ref: insp_ga_fsp-060-013443_2026-03-19_40040
Cited Observations & Standards
Item 16A Good Retail Practice

Hot and cold water available; adequate pressure — Inspector Note: Oberseved no hot water. 511-6-1.06(1)(g),(h) - Water Supply, Capacity; Pressure (Pf) (g) Capacity. 1. The water source and system shall be of sufficient capacity to meet the peak water demands of the food service establishment. Pf 2. Hot water generation and distribution systems shall be sufficient to meet the peak hot water demands throughout the food service establishment. Pf (h) Pressure. Water under pressure shall be provided to all fixtures, equipment, and nonfood equipment that are required to use water except that water supplied as specified under subsection (1)(k)1 and 2 to a temporary food service operation or in response to a temporary interruption of a water supply need not be under pressure. Pf

Item 17C Good Retail Practice

Physical facilities installed, maintained, and clean — Inspector Note: Ceiling not smooth and easily cleanable. 511-6-1.07(2)(a) - Floor, Walls, & Ceilings, Cleanability (C) (2) Design, Construction, and Installation. (a) Floors, Walls, and Ceilings, Cleanability. Except as specified under subsection (2)(d) of this Rule and except for antislip floor coverings or applications that may be used for safety reasons, floors, floor coverings, walls, wall coverings, and ceilings shall be designed, constructed, and installed so they are smooth and easily cleanable.

Item 2-2D Critical / Risk Factor

Adequate handwashing facilities supplied & accessible — Inspector Note: Hand sink is not equipped to provide tempered water at a temperature of at least 100F through a mixing valve or combination faucet. 511-6-1.07(3)(b) - Hand Drying Provision (Pf) (b) Hand Drying Provision. Each handwashing sink or group of adjacent handwashing sinks shall be provided with: 1. Individual, disposable towels; Pf 2. A continuous towel system that supplies the user with a clean towel; Pf 3. A heated-air hand drying device; Pf or 4. A hand drying device that employs an air-knife system that delivers high velocity, pressurized air at ambient temperatures.Pf